ᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ

ᱣᱤᱠᱤᱯᱤᱰᱤᱭᱟ, ᱨᱟᱲᱟ ᱜᱮᱭᱟᱱ ᱯᱩᱛᱷᱤ ᱠᱷᱚᱱ
(ᱯᱚᱫᱫᱟ ᱥᱟᱠᱳ ᱠᱷᱚᱱ ᱟᱹᱪᱩᱨ ᱦᱮᱡᱠᱟᱱᱟ)
ᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ

পদ্মা সেতু
Coordinates 23°26′39″N 90°15′40″E / 23.4443°N 90.261°E / 23.4443; 90.261Coordinates: 23°26′39″N 90°15′40″E / 23.4443°N 90.261°E / 23.4443; 90.261
ᱤᱫᱤᱭᱟᱢᱚᱴᱚᱨ ᱜᱟᱹᱰᱤ, ᱨᱮᱞ ᱜᱟᱹᱰᱤ
ᱟᱹᱢᱟᱹᱞᱮᱛ ᱧᱩᱛᱩᱢᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ
Ownerᱵᱟᱝᱞᱟᱫᱮᱥ ᱥᱚᱨᱠᱟᱨ
Websitewww.padmabridge.gov.bd
Characteristics
ᱰᱤᱡᱮᱱᱴᱨᱟᱥᱴ ᱥᱟᱠᱳ
ᱜᱩᱴ ᱡᱤᱞᱤᱝ᱖,᱑᱕᱐ ᱢᱤ (᱒᱐,᱑᱘᱐ ᱯᱷᱩᱴ)
ᱚᱥᱟᱨ᱑᱘.᱑᱘ ᱢᱤᱴᱟᱨ
ᱩᱥᱩᱞ᱑᱒᱐ ᱢᱤᱴᱟᱨ (᱓᱙᱔ ᱯᱷᱩᱴ)
Water depth122 m (400 ft)[᱑]
ᱥᱯᱮᱱ ᱮᱞ᱔᱑
Load limit᱑᱐,᱐᱐᱐ ᱴᱚᱱ[᱑]
No. of lanes
History
DesignerAECOM
ᱤᱫᱤ ᱛᱮ ᱵᱮᱱᱟᱣ ᱟᱠᱟᱱᱟᱪᱟᱭᱱᱟ ᱢᱮᱡᱚᱨ ᱵᱨᱤᱡᱽ ᱤᱧᱡᱤᱱᱤᱭᱚᱨᱤᱝ ᱠᱚᱱᱥᱴᱨᱟᱠᱥᱚᱱ ᱠᱚᱢᱯᱟᱱᱤ ᱞᱤᱢᱤᱴᱮᱰ
ᱵᱮᱱᱟᱣ ᱮᱦᱚᱵ᱒᱖ ᱱᱚᱵᱷᱮᱢᱵᱚᱨ ᱒᱐᱑᱔ (2014-11-26)
ᱵᱮᱱᱟᱣ ᱢᱩᱪᱟᱹᱫ᱒᱒ ᱡᱩᱱ ᱒᱐᱒᱒ (2022-06-22)[᱒]
ᱮᱦᱚᱵ ᱮᱱᱟ30193.39 crore ({{BDTConvert/Expression error: ᱵᱟᱝ ᱧᱮᱞ ᱴᱷᱤᱠᱚᱜᱠᱟᱱ ᱪᱤᱱᱦᱟᱹ ᱠᱚ "[".|30193.39|7||USD|year={{{year}}}}}) (2018 estimates)[᱓]
ᱮᱦᱚᱵ ᱮᱱᱟ᱒᱕ ᱡᱩᱱ ᱒᱐᱒᱒ (2022-06-25) 10:00 (BST)
ᱩᱰᱟᱹᱣ ᱥᱟᱹᱜᱩᱱ᱒᱕ ᱡᱩᱱ ᱒᱐᱒᱒ (2022-06-25)
Statistics
TollYes
Map

ᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ ᱫᱚ ᱵᱟᱝᱞᱟᱫᱮᱥ ᱨᱮᱭᱟᱜ ᱯᱚᱫᱽᱫᱟ ᱜᱟᱰᱟ ᱪᱮᱛᱟᱱ ᱵᱮᱱᱟᱣ ᱢᱤᱫ ᱥᱚᱲᱚᱠ ᱟᱨ ᱨᱮᱞ ᱥᱟᱠᱳ ᱠᱟᱱᱟ᱾ ᱱᱚᱣᱟ ᱫᱚ ᱵᱟᱝᱞᱟᱫᱮᱥ ᱨᱮᱭᱟᱜ ᱥᱚᱨᱤᱭᱚᱛᱯᱩᱨ ᱦᱚᱱᱚᱛ ᱥᱟᱶ ᱢᱟᱫᱟᱨᱤᱯᱩᱨ ᱦᱚᱱᱚᱛ ᱮ ᱡᱚᱲᱟᱣᱮᱫ ᱠᱟᱱᱟ᱾ ᱱᱚᱣᱟ ᱥᱟᱠᱳ ᱦᱚᱛᱮᱛᱮ ᱫᱤᱥᱚᱢ ᱨᱮᱭᱟᱜ ᱮᱛᱚᱢᱼᱯᱟᱪᱷᱮ ᱴᱚᱴᱷᱟ, ᱠᱚᱧᱮ ᱟᱨ ᱥᱟᱢᱟᱝ ᱴᱟᱴᱷᱟ ᱥᱟᱶᱛᱮ ᱡᱚᱲᱟᱣᱚᱜ ᱠᱟᱱᱟ᱾ ᱒᱕ ᱡᱩᱱ ᱒᱐᱒᱒ ᱢᱟᱹᱦᱤᱛ ᱨᱮ ᱱᱚᱣᱟ ᱥᱟᱠᱳ ᱩᱰᱟᱹᱣ ᱥᱟᱹᱜᱩᱱ ᱨᱮᱭᱟᱜ ᱠᱟᱛᱷᱟ ᱢᱮᱱᱟᱜᱼᱟ᱾[᱒] ᱵᱟᱨ ᱛᱚᱞᱟ ᱨᱮᱭᱟᱜ ᱥᱴᱤᱞ ᱟᱨ ᱠᱚᱝᱠᱨᱤᱴ ᱛᱮ ᱵᱮᱱᱟᱣ ᱴᱨᱟᱥᱴ ᱨᱮᱭᱟᱜ ᱱᱚᱣᱟ ᱥᱟᱠᱳ ᱨᱮᱭᱟᱜ ᱪᱮᱛᱟᱱ ᱨᱮᱫᱚ ᱯᱩᱱ ᱞᱮᱱ ᱨᱮᱭᱟᱜ ᱥᱚᱲᱚᱠ ᱟᱨ ᱞᱟᱛᱟᱨ ᱛᱚᱞᱟ ᱨᱮᱫᱚ ᱢᱤᱫ ᱞᱟᱭᱤᱱ ᱨᱮᱭᱟᱜ ᱨᱮᱞ ᱰᱟᱦᱟᱨ ᱢᱮᱱᱟᱜᱼᱟ᱾[᱔] ᱥᱟᱠᱳ ᱫᱚ ᱯᱚᱫᱽᱫᱟ ᱜᱟᱰᱟ ᱪᱮᱛᱟᱱ ᱔᱒ ᱜᱚᱴᱟᱱ ᱯᱤᱞᱟᱨ ᱟᱨ ᱑᱕᱐ ᱢᱤᱴᱟᱨ ᱞᱤᱡᱤᱧ ᱔᱑ ᱜᱚᱴᱟᱱ ᱥᱯᱮᱱ ᱛᱮ ᱜᱩᱴ ᱖.᱑᱕᱐ ᱠᱤᱢᱤ (᱓.᱘᱒᱑ ᱢᱟᱭᱤᱞ) ᱡᱤᱞᱤᱧ ᱟᱨ ᱒᱒.᱕ ᱢᱤᱴᱟᱨ (᱗᱔ ᱯᱷᱩᱴ) ᱚᱥᱟᱨᱟ᱾[᱕] ᱱᱚᱣᱟ ᱫᱚ ᱵᱟᱝᱞᱟᱫᱮᱥ ᱟᱨ ᱜᱟᱝᱱᱟᱹᱭ ᱪᱮᱛᱟᱱ ᱵᱮᱱᱟᱣ ᱟᱠᱟᱱ ᱥᱟᱱᱟᱢ ᱠᱷᱚᱱ ᱡᱤᱞᱤᱧ ᱥᱟᱠᱳ ᱠᱟᱱᱟ᱾

ᱱᱟᱜᱟᱢ[ᱥᱟᱯᱲᱟᱣ | ᱯᱷᱮᱰᱟᱛ ᱥᱟᱯᱲᱟᱣ]

ᱵᱮᱱᱟᱣ ᱠᱟᱹᱢᱤᱦᱚᱨᱟ[ᱥᱟᱯᱲᱟᱣ | ᱯᱷᱮᱰᱟᱛ ᱥᱟᱯᱲᱟᱣ]

ᱪᱤᱛᱟᱹᱨ[ᱥᱟᱯᱲᱟᱣ | ᱯᱷᱮᱰᱟᱛ ᱥᱟᱯᱲᱟᱣ]

ᱵᱟᱨᱦᱮ ᱡᱚᱱᱚᱲ[ᱥᱟᱯᱲᱟᱣ | ᱯᱷᱮᱰᱟᱛ ᱥᱟᱯᱲᱟᱣ]

ᱥᱟᱹᱠᱷᱭᱟᱹᱛ[ᱥᱟᱯᱲᱟᱣ | ᱯᱷᱮᱰᱟᱛ ᱥᱟᱯᱲᱟᱣ]

  1. ᱑.᱐ ᱑.᱑ "Padma bridge: কলকাতা থেকে ঢাকা আরও সাড়ে তিন ঘণ্টা সময় কমছে, জুনে খুলে যাচ্ছে পদ্মা সেতু". www.anandabazar.com. Retrieved 27 May 2022.
  2. ᱒.᱐ ᱒.᱑ "Padma Bridge likely to open to traffic by June 2022". Dhaka Tribune. 10 December 2020. Retrieved 27 May 2022.
  3. "How Padma Bridge cost surged to Tk30,000cr". The Business Standard (in ᱟᱝᱜᱽᱨᱮᱡᱤ). 12 December 2020. Retrieved 27 May 2022.
  4. Sultana Munima (14 October 2014). "Korean co gets Pawdda bridge supervision work". The Financial Express. Dhaka. Retrieved 11 November 2014.
  5. "Padma Multipurpose Bridge Project, Volume II: Environmental Assessment". World Bank. 6 September 2010. Retrieved 15 April 2021.