ᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ

পদ্মা সেতু
Coordinates 23°26′39″N 90°15′40″E / 23.4443°N 90.261°E / 23.4443; 90.261Coordinates: 23°26′39″N 90°15′40″E / 23.4443°N 90.261°E / 23.4443; 90.261
ᱤᱫᱤᱭᱟᱢᱚᱴᱚᱨ ᱜᱟᱹᱰᱤ, ᱨᱮᱞ ᱜᱟᱹᱰᱤ
ᱟᱹᱢᱟᱹᱞᱮᱛ ᱧᱩᱛᱩᱢᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ
Ownerᱵᱟᱝᱞᱟᱫᱮᱥ ᱥᱚᱨᱠᱟᱨ
Websitewww.padmabridge.gov.bd
Characteristics
ᱰᱤᱡᱮᱱᱴᱨᱟᱥᱴ ᱥᱟᱠᱳ
ᱜᱩᱴ ᱡᱤᱞᱤᱝ᱖,᱑᱕᱐ ᱢᱤ (᱒᱐,᱑᱘᱐ ᱯᱷᱩᱴ)
ᱚᱥᱟᱨ᱑᱘.᱑᱘ ᱢᱤᱴᱟᱨ
ᱩᱥᱩᱞ᱑᱒᱐ ᱢᱤᱴᱟᱨ (᱓᱙᱔ ᱯᱷᱩᱴ)
Water depth122 m (400 ft)[᱑]
ᱥᱯᱮᱱ ᱮᱞ᱔᱑
Load limit᱑᱐,᱐᱐᱐ ᱴᱚᱱ[᱑]
No. of lanes᱔
History
DesignerAECOM
ᱤᱫᱤ ᱛᱮ ᱵᱮᱱᱟᱣ ᱟᱠᱟᱱᱟᱪᱟᱭᱱᱟ ᱢᱮᱡᱚᱨ ᱵᱨᱤᱡᱽ ᱤᱧᱡᱤᱱᱤᱭᱚᱨᱤᱝ ᱠᱚᱱᱥᱴᱨᱟᱠᱥᱚᱱ ᱠᱚᱢᱯᱟᱱᱤ ᱞᱤᱢᱤᱴᱮᱰ
ᱵᱮᱱᱟᱣ ᱮᱦᱚᱵ᱒᱖ ᱱᱚᱵᱷᱮᱢᱵᱚᱨ ᱒᱐᱑᱔ (2014-11-26)
ᱵᱮᱱᱟᱣ ᱢᱩᱪᱟᱹᱫ᱒᱒ ᱡᱩᱱ ᱒᱐᱒᱒ (2022-06-22)[᱒]
ᱮᱦᱚᱵ ᱮᱱᱟ৳30193.39 crore ({{BDTConvert/Expression error: ᱵᱟᱝ ᱧᱮᱞ ᱴᱷᱤᱠᱚᱜᱠᱟᱱ ᱪᱤᱱᱦᱟᱹ ᱠᱚ "[".|30193.39|7||USD|year={{{year}}}}}) (2018 estimates)[᱓]
ᱮᱦᱚᱵ ᱮᱱᱟ᱒᱕ ᱡᱩᱱ ᱒᱐᱒᱒ (2022-06-25) 10:00 (BST)
ᱩᱰᱟᱹᱣ ᱥᱟᱹᱜᱩᱱ᱒᱕ ᱡᱩᱱ ᱒᱐᱒᱒ (2022-06-25)
Statistics
TollYes
Map

ᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ ᱫᱚ ᱵᱟᱝᱞᱟᱫᱮᱥ ᱨᱮᱭᱟᱜ ᱯᱚᱫᱽᱫᱟ ᱜᱟᱰᱟ ᱪᱮᱛᱟᱱ ᱵᱮᱱᱟᱣ ᱢᱤᱫ ᱥᱚᱲᱚᱠ ᱟᱨ ᱨᱮᱞ ᱥᱟᱠᱳ ᱠᱟᱱᱟ᱾ ᱱᱚᱣᱟ ᱫᱚ ᱵᱟᱝᱞᱟᱫᱮᱥ ᱨᱮᱭᱟᱜ ᱥᱚᱨᱤᱭᱚᱛᱯᱩᱨ ᱦᱚᱱᱚᱛ ᱥᱟᱶ ᱢᱟᱫᱟᱨᱤᱯᱩᱨ ᱦᱚᱱᱚᱛ ᱮ ᱡᱚᱲᱟᱣᱮᱫ ᱠᱟᱱᱟ᱾ ᱱᱚᱣᱟ ᱥᱟᱠᱳ ᱦᱚᱛᱮᱛᱮ ᱫᱤᱥᱚᱢ ᱨᱮᱭᱟᱜ ᱮᱛᱚᱢᱼᱯᱟᱪᱷᱮ ᱴᱚᱴᱷᱟ, ᱠᱚᱧᱮ ᱟᱨ ᱥᱟᱢᱟᱝ ᱴᱟᱴᱷᱟ ᱥᱟᱶᱛᱮ ᱡᱚᱲᱟᱣᱚᱜ ᱠᱟᱱᱟ᱾ ᱒᱕ ᱡᱩᱱ ᱒᱐᱒᱒ ᱢᱟᱹᱦᱤᱛ ᱨᱮ ᱱᱚᱣᱟ ᱥᱟᱠᱳ ᱩᱰᱟᱹᱣ ᱥᱟᱹᱜᱩᱱ ᱨᱮᱭᱟᱜ ᱠᱟᱛᱷᱟ ᱢᱮᱱᱟᱜᱼᱟ᱾[᱒] ᱵᱟᱨ ᱛᱚᱞᱟ ᱨᱮᱭᱟᱜ ᱥᱴᱤᱞ ᱟᱨ ᱠᱚᱝᱠᱨᱤᱴ ᱛᱮ ᱵᱮᱱᱟᱣ ᱴᱨᱟᱥᱴ ᱨᱮᱭᱟᱜ ᱱᱚᱣᱟ ᱥᱟᱠᱳ ᱨᱮᱭᱟᱜ ᱪᱮᱛᱟᱱ ᱨᱮᱫᱚ ᱯᱩᱱ ᱞᱮᱱ ᱨᱮᱭᱟᱜ ᱥᱚᱲᱚᱠ ᱟᱨ ᱞᱟᱛᱟᱨ ᱛᱚᱞᱟ ᱨᱮᱫᱚ ᱢᱤᱫ ᱞᱟᱭᱤᱱ ᱨᱮᱭᱟᱜ ᱨᱮᱞ ᱰᱟᱦᱟᱨ ᱢᱮᱱᱟᱜᱼᱟ᱾[᱔] ᱥᱟᱠᱳ ᱫᱚ ᱯᱚᱫᱽᱫᱟ ᱜᱟᱰᱟ ᱪᱮᱛᱟᱱ ᱔᱒ ᱜᱚᱴᱟᱱ ᱯᱤᱞᱟᱨ ᱟᱨ ᱑᱕᱐ ᱢᱤᱴᱟᱨ ᱞᱤᱡᱤᱧ ᱔᱑ ᱜᱚᱴᱟᱱ ᱥᱯᱮᱱ ᱛᱮ ᱜᱩᱴ ᱖.᱑᱕᱐ ᱠᱤᱢᱤ (᱓.᱘᱒᱑ ᱢᱟᱭᱤᱞ) ᱡᱤᱞᱤᱧ ᱟᱨ ᱒᱒.᱕ ᱢᱤᱴᱟᱨ (᱗᱔ ᱯᱷᱩᱴ) ᱚᱥᱟᱨᱟ᱾[᱕] ᱱᱚᱣᱟ ᱫᱚ ᱵᱟᱝᱞᱟᱫᱮᱥ ᱟᱨ ᱜᱟᱝᱱᱟᱹᱭ ᱪᱮᱛᱟᱱ ᱵᱮᱱᱟᱣ ᱟᱠᱟᱱ ᱥᱟᱱᱟᱢ ᱠᱷᱚᱱ ᱡᱤᱞᱤᱧ ᱥᱟᱠᱳ ᱠᱟᱱᱟ᱾

ᱵᱮᱱᱟᱣ ᱠᱟᱹᱢᱤᱦᱚᱨᱟ

[ᱥᱟᱯᱲᱟᱣ | ᱯᱷᱮᱰᱟᱛ ᱥᱟᱯᱲᱟᱣ]
  1. 1 2 "Padma bridge: কলকাতা থেকে ঢাকা আরও সাড়ে তিন ঘণ্টা সময় কমছে, জুনে খুলে যাচ্ছে পদ্মা সেতু". www.anandabazar.com. Retrieved 27 May 2022.
  2. 1 2 "Padma Bridge likely to open to traffic by June 2022". Dhaka Tribune. 10 December 2020. Retrieved 27 May 2022.
  3. ↑ "How Padma Bridge cost surged to Tk30,000cr". The Business Standard (in ᱟᱝᱜᱽᱨᱮᱡᱤ). 12 December 2020. Retrieved 27 May 2022.
  4. ↑ Sultana Munima (14 October 2014). "Korean co gets Pawdda bridge supervision work". The Financial Express. Dhaka. Retrieved 11 November 2014.
  5. ↑ "Padma Multipurpose Bridge Project, Volume II: Environmental Assessment". World Bank. 6 September 2010. Archived from the original on 27 May 2023. Retrieved 15 April 2021.